Scope Cutting new slab openings, blockwork, screed, lift shaft and structural steel and fire protection. Description LDD’s package involved creating 6no accommodation stair openings including cutting out existing slab in the manageable sections, and installation of new steel trimmer beams and TMD’s. Rc infills, block work lift shafts and RC lift pits, screeding, Passive fire protection to service holes and steel beams, traffic bollards installed to the main entrance. Key factors include cutting slab openings in a confined space controlling dust and noise around other trades.  All lifting operations were required to be carried...

Kings Court

Scope Demolition and strip out of walls, floors and staircases over 5 floors. Excavation and install of drainage and lift pits incorporating underpinning. Description Strip out of all walls throughout all floors working from access equipment was carried out working to coded drawings due to heritage items with in the building Strip out of passenger lifts, lift caps and lift gear were carried out in tandem with the scaffold contractor to ensure safe access was available at all times. Demo to structural staircase and lift core, using Brokk whilst working around 2 designs of temporary works,...

Fetter Lane

Scope Soft strip of existing office spaces throughout levels 7 to ground floor, including ceilings, partitions, services, carpets and RAF. Description LDD were tasked with undertaking a large scale cut and carve project in a bust thoroughfare in close proximity to local commercial properties and retail outlets. Noise, vibration and third party protection were 3 of the major areas of concern at the outset of the project, but by collaborative working with the MC structural engineer, LDD temps works engineer, onsite scaffolders and a variety of plant and methods we were able to hit...

100 Bishopsgate

Scope Diamond Drilling basement -3 to level 37, Concrete cutting loading bay slabs and walls, Staircase openings, Concrete repairs to RC transfer beams, Firestopping to basement 3 – to level 37 Description The diamond drilling package involved the removal of RC slabs and walls to form new staircase openings, smoke vents and doorways. We removed the temporary loading bay ramp and walls where all skip vehicles reversed so the crane could load waste. All drilling noise had to be managed due to the close proximity of local residents. We had to cut and lift sections of RC...

1 Finsbury Avenue

Scope Strip out of link bridges, Soft strip out plantrooms, BWIC Description LDD’s package involves BWIC drainage. Stripout of Durasteel in plantrooms, removal of link bridges, demolition, casting all structural works for the Everyman Cinema. LDD’s works started off in the basement installing a new underground drainage system to facilitate future tenants. We installed in excess of 200LM of drainage which had to be installed in 6LM runs at a time to ensure the structure of the building was not compromised. Some of the drainage runs were in excess of 2000mm deep so significant temporary works...