Lorem ipsum gravida nibh vel velit auctor aliquetenean sollicitudin, lorem quis bibendum auci elit consequat ipsutis sem nibh id elit duis sed.
Monday - Friday 08:00 - 20:00

Saturday and Sunday - CLOSED

+ 0800 2466 7921

office@construction.com

34th Avenue

New York, W2 3XE

Call us

020 7277 3877

Email us

info@lddgroup.co.uk

Top
 

Archive

Shell HQ

Scope Strip out of floors 23 to Ground Description LDD’s package involves the strip out of the glazed meeting rooms, plasterboard partitions, tea points, and screed on all floors. New block work was erected in the Basement levels, new screed, new beam clad to steels and passive firestopping carried out throughout all floors. Key factors include logistical issues, ensuring zero disruption to active office areas and ensuring we meet the standards required to obtain LEED gold standard. We worked alongside Overbury to comply with Shells strict health and safety policies, including ensuring permits were...

Fenchurch Avenue

Scope Cutting new slab openings, blockwork, screed, lift shaft and structural steel and fire protection. Description LDD’s package involved creating 6no accommodation stair openings including cutting out existing slab in the manageable sections, and installation of new steel trimmer beams and TMD’s. Rc infills, block work lift shafts and RC lift pits, screeding, Passive fire protection to service holes and steel beams, traffic bollards installed to the main entrance. Key factors include cutting slab openings in a confined space controlling dust and noise around other trades.  All lifting operations were required to be carried...