Lorem ipsum gravida nibh vel velit auctor aliquetenean sollicitudin, lorem quis bibendum auci elit consequat ipsutis sem nibh id elit duis sed.
Monday - Friday 08:00 - 20:00

Saturday and Sunday - CLOSED

+ 0800 2466 7921

office@construction.com

34th Avenue

New York, W2 3XE

Call us

020 7277 3877

Email us

info@lddgroup.co.uk

Top
 

Archive

Shell HQ

Scope Strip out of floors 23 to Ground Description LDD’s package involves the strip out of the glazed meeting rooms, plasterboard partitions, tea points, and screed on all floors. New block work was erected in the Basement levels, new screed, new beam clad to steels and passive firestopping carried out throughout all floors. Key factors include logistical issues, ensuring zero disruption to active office areas and ensuring we meet the standards required to obtain LEED gold standard. We worked alongside Overbury to comply with Shells strict health and safety policies, including ensuring permits were...

Photo of a corner building on Oxford Street that's going to be used by Microsoft.

Microsoft European Flagship Store

Scope Strip out, structural works, steel works and builders Description LDD’s package involves the strip out of the old Benneton shop plasterboard partitions, escalators and screed over 4 floors. It was important that caution was taken removing stud was to prevent any damage to heritage ceilings and column behind. This was also an important factor during the fit-out stages, ensuring nothing was knocked or removed accidently new steel work for structural strengthening, lift shafts, risers and plant gantries. Screeding through floors, fire curtains and basement dam proofing Key factors include working around heritage ceilings and...

33 Portland Place

Scope LDD installed the helibar system to every corner of the listed building to prevent un-bonded walls pulling apart and to stabilise structural cracks expanding further. The system was installed over a programme of circa 3nr weeks, circa 150LM of bars installed across 4nr floors. Description Rake out or cut slots into the horizontal mortar beds, a minimum of 500mm either side of the crack Clean out slots and flush with clean water and thoroughly soak the substrate within the slot Using the Helifix Pointing gun, inject a bead of HeliBond along...

Fenchurch Avenue

Scope Cutting new slab openings, blockwork, screed, lift shaft and structural steel and fire protection. Description LDD’s package involved creating 6no accommodation stair openings including cutting out existing slab in the manageable sections, and installation of new steel trimmer beams and TMD’s. Rc infills, block work lift shafts and RC lift pits, screeding, Passive fire protection to service holes and steel beams, traffic bollards installed to the main entrance. Key factors include cutting slab openings in a confined space controlling dust and noise around other trades.  All lifting operations were required to be carried...

Kings Court

Scope Demolition and strip out of walls, floors and staircases over 5 floors. Excavation and install of drainage and lift pits incorporating underpinning. Description Strip out of all walls throughout all floors working from access equipment was carried out working to coded drawings due to heritage items with in the building Strip out of passenger lifts, lift caps and lift gear were carried out in tandem with the scaffold contractor to ensure safe access was available at all times. Demo to structural staircase and lift core, using Brokk whilst working around 2 designs of temporary works,...

Fetter Lane

Scope Soft strip of existing office spaces throughout levels 7 to ground floor, including ceilings, partitions, services, carpets and RAF. Description LDD were tasked with undertaking a large scale cut and carve project in a bust thoroughfare in close proximity to local commercial properties and retail outlets. Noise, vibration and third party protection were 3 of the major areas of concern at the outset of the project, but by collaborative working with the MC structural engineer, LDD temps works engineer, onsite scaffolders and a variety of plant and methods we were able to hit...

100 Bishopsgate

Scope Diamond Drilling basement -3 to level 37, Concrete cutting loading bay slabs and walls, Staircase openings, Concrete repairs to RC transfer beams, Firestopping to basement 3 – to level 37 Description The diamond drilling package involved the removal of RC slabs and walls to form new staircase openings, smoke vents and doorways. We removed the temporary loading bay ramp and walls where all skip vehicles reversed so the crane could load waste. All drilling noise had to be managed due to the close proximity of local residents. We had to cut and lift sections of RC...

1 Finsbury Avenue

Scope Strip out of link bridges, Soft strip out plantrooms, BWIC Description LDD’s package involves BWIC drainage. Stripout of Durasteel in plantrooms, removal of link bridges, demolition, casting all structural works for the Everyman Cinema. LDD’s works started off in the basement installing a new underground drainage system to facilitate future tenants. We installed in excess of 200LM of drainage which had to be installed in 6LM runs at a time to ensure the structure of the building was not compromised. Some of the drainage runs were in excess of 2000mm deep so significant temporary works...

Folgate Street

Scope Complete strip out of stud walls, shopfront glazing, and demo of the RC slab Description LDD were the principal contractors on this project so had to ensure a good relationship with Tower Hamlets council and the local residents at all times. Hoarding licenses and section 50 permit to dig the public highway applications were requested and approved for by Tower Hamlets council for works required to the external area of the project. Temporary works were designed and installed to secure the party wall during the works. When the demo was complete the reinstatement of a...

Credit Suisse

Scope Strip out of 19 floors to ground Description LDD’s package involves the strip out of the glazed meeting rooms, plasterboard partitions, tea points, screed on all floors, ceilings, carpets, high level services and low-level services. Key factors include logistical issues, ensuring zero disruption to active office areas and ensuring we meet the standards required to obtain Breeam. Our TSM worked alongside ISG and CBRE to ensure that all services were isolated before strip out commences. This was complicated in that some services fed different floors and certain services needed to remain live for safety...