Lorem ipsum gravida nibh vel velit auctor aliquetenean sollicitudin, lorem quis bibendum auci elit consequat ipsutis sem nibh id elit duis sed.
Monday - Friday 08:00 - 20:00

Saturday and Sunday - CLOSED

+ 0800 2466 7921

office@construction.com

34th Avenue

New York, W2 3XE

Call us

020 7277 3877

Email us

info@lddgroup.co.uk

Top
 

Archive

100 Bishopsgate

Scope Diamond Drilling basement -3 to level 37, Concrete cutting loading bay slabs and walls, Staircase openings, Concrete repairs to RC transfer beams, Firestopping to basement 3 – to level 37 Description The diamond drilling package involved the removal of RC slabs and walls to form new staircase openings, smoke vents and doorways. We removed the temporary loading bay ramp and walls where all skip vehicles reversed so the crane could load waste. All drilling noise had to be managed due to the close proximity of local residents. We had to cut and lift sections of RC...

1 Finsbury Avenue

Scope Strip out of link bridges, Soft strip out plantrooms, BWIC Description LDD’s package involves BWIC drainage. Stripout of Durasteel in plantrooms, removal of link bridges, demolition, casting all structural works for the Everyman Cinema. LDD’s works started off in the basement installing a new underground drainage system to facilitate future tenants. We installed in excess of 200LM of drainage which had to be installed in 6LM runs at a time to ensure the structure of the building was not compromised. Some of the drainage runs were in excess of 2000mm deep so significant temporary works...