1 Finsbury Avenue
Scope Strip out of link bridges, Soft strip out plantrooms, BWIC Description LDD’s package involves BWIC drainage. Stripout of Durasteel in plantrooms, removal of link bridges, demolition, casting all structural works for the Everyman Cinema. LDD’s works started off in the basement installing a new underground drainage system to facilitate future tenants. We installed in excess of 200LM of drainage which had to be installed in 6LM runs at a time to ensure the structure of the building was not compromised. Some of the drainage runs were in excess of 2000mm deep so significant temporary works...
Lyric Square
Scope Removal of 4m x 2m RC panels on the outside of the building on level 13 and the removal of the entire 13th floor RC slab. Description LDD were tasked with undertaking a large-scale demolition project next to the lyric theatre in Hammersmith. Noise, vibration and third-party protection were 3 of the major areas of concern at the outset of the project as well as having LUL lines running next to the building. LDD installed noise monitors and vibration monitors around certain areas of the building. LDD held responsibility for the methodology, all temporary works...
Publishing House, London Bridge
Fit out of 17 floors including new mezzanine floor and adaptations to slab....